Home/Answers/Replacement
FURNACE COST LAB / Replacement

How to Set Up Replacement

To set up Replacement, confirm the input format/device, choose output settings, then run a small batch.

Updated 2026-11-01About 3 minLocal test
Quick answer

To set up Replacement, confirm the input format/device, choose output settings, then run a small batch. Replacement depends on old unit/ducts/venting/disposal.

Why it matters

Validate on a small sample before running the whole batch.

Old unit.

Step by step

  1. Check fuel/efficiency/ducts/electrical/venting/old unit.
  2. Separate equipment/install/ducts/venting/permits.
  3. Check rebates/tax credits/financing.
  4. Get 2-3 quotes; confirm model/install/warranty.

Common mistakes

  • Equipment price only, not install/ducts.
  • Ignoring venting/electrical/permits.
  • Not checking rebates/efficiency.
  • No model/warranty terms.

Checklist

  • Fuel/efficiency/ducts/electrical/venting.
  • Equipment/install/ducts/permits.
  • Rebates/financing/old unit disposal.
  • Model/warranty/payment.
  • Budget/maintenance/emergency.

Key facts

  • Old unit.
  • Ducts.
  • Disposal.

FAQ

How do I set up Replacement?

To set up Replacement, confirm the input format/device, choose output settings, then run a small batch. Replacement depends on old unit/ducts/venting/disposal.

How long does it take?

Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.

Is data uploaded?

Runs locally and does not upload video/audio; extensions may still read the page.

Source: Energy.gov